Four procedures we work to today.
An information model before construction surfaces clashes on screen, not on site.
Work is executed by a specialist trade network, under written terms for every relationship.
Every item has an acceptance criterion and a hold point before it is covered.
The owner knows where the project stands every week.
Safety requirements are written into every subcontractor's contract: personal protective equipment, protection of openings and edges, isolation of electrical works, and orderly handling of materials and waste. Compliance is checked on the regular supervision rounds.
| Saudi Contractors Authority | 1242124291 |
|---|---|
| Commercial registration | 7052908584 |
| VAT number | 314472437200003 |
| Contractor classification | None currently · planned for the next stage |
| ISO certifications | None currently · documentation in preparation |
Classification is a prerequisite for government and institutional tenders, and is planned for the next stage.
We come back with a preliminary scope and cost range.